Loading...
Guest user 
« #79040
 
All history
 
#79054 »
Result: Build chronik-client-integration-tests failed with exit code 1 Agent: buildagent8  ( ABC Build Pool pool)
Time: 26 Jun 24 18:18 - 18:27 (8m:58s) Triggered by: Phabricator Staging on 26 Jun 24 18:18
Branch:

Code coverage

Methods: 24.5%24.5% Blocks: 28.3%28.3% Lines: 28.3%28.3%
Diff: -46.38% Diff: -43.31% Diff: -43.42%

Build problems: 2 (2 new)

Problem reported from build script (1)
Build chronik-client-integration-tests failed with exit code 1  
Build failure condition (1)
Process exited with code 1 (Step: Command Line)  
 Loading build log messages...
×

×

Pin build

Cancel
×

Add build comment

Cancel
×

Promote Build

×

Add build comment

Cancel
×

Mute test

×

×

Server communication failure

Server is unavailable

Server stopped or communication with the server is not possible due to network failure.

Server shutdown started.

Please relogin to continue your work.

×

Run Custom Build

×

TODO

Loading related builds...
Cancel
×

Responsibility

×

Edit tags

Cancel
×

Loading...

×

Are you sure?

Cancel
×

Cancel