Loading...
« #80280
 
All history
 
#80416 »
Result: Build chronik-client-integration-tests failed with exit code 1 Agent: buildagent3  (ABC Build Pool pool)
Time: 23 Jul 24 16:38 - 16:47 (9m:21s) Triggered by: Phabricator Staging on 23 Jul 24 16:11 Build parameters have been customized
Branch:

Code coverage

Methods: 24.5%24.5% Blocks: 28.3%28.3% Lines: 28.3%28.3%
Diff: -46.52% Diff: -43.29% Diff: -43.4%

Build problems: 2 (2 new)

Problem reported from build script (1)
Build chronik-client-integration-tests failed with exit code 1  
Build failure condition (1)
Process exited with code 1 (Step: Command Line)  
 Loading build log messages...
×

×

Pin build

Cancel
×

Add build comment

Cancel
×

Promote Build

×

Add build comment

Cancel
×

Mute test

×

×

Server communication failure

Server is unavailable

Server stopped or communication with the server is not possible due to network failure.

Server shutdown started.

Please relogin to continue your work.

×

Run Custom Build

×

TODO

Loading related builds...
Cancel
×

Responsibility

×

Edit tags

Cancel
×

Loading...

×

Are you sure?

Cancel
×

Please type to confirm.
Cancel