Loading...
« #80356
 
All history
 

Last recorded build

Result: Build chronik-client-integration-tests failed with exit code 1 Agent: buildagent4  (ABC Build Pool pool)
Time: 24 Jul 24 01:23 - 01:28 (5m:23s) Triggered by: Phabricator Staging on 24 Jul 24 01:17 Build parameters have been customized
Branch:

Code coverage

Methods: 1.4%1.4% Blocks: 5.3%5.3% Lines: 5.2%5.2%
Diff: -21.78% Diff: -28.64% Diff: -28.92%

Build problems: 2 (1 new)

Problem reported from build script (1)
Build chronik-client-integration-tests failed with exit code 1  
Build failure condition (1)
Process exited with code 1 (Step: Command Line)  
 Loading build log messages...
×

×

Pin build

Cancel
×

Add build comment

Cancel
×

Promote Build

×

Add build comment

Cancel
×

Mute test

×

×

Server communication failure

Server is unavailable

Server stopped or communication with the server is not possible due to network failure.

Server shutdown started.

Please relogin to continue your work.

×

Run Custom Build

×

TODO

Loading related builds...
Cancel
×

Responsibility

×

Edit tags

Cancel
×

Loading...

×

Are you sure?

Cancel
×

Please type to confirm.
Cancel