Result: | Build ecash-lib-integration-tests failed with exit code 5 | Agent: | buildagent9 (ABC Build Pool pool) |
Time: | 29 Jul 24 16:47 - 16:54 (7m:36s) | Triggered by: | Phabricator Staging on 29 Jul 24 16:03 Build parameters have been customized |
Branch: |
Methods: | Blocks: | Lines: | |||
Diff: | +64.62% | Diff: | +66.88% | Diff: | +66.85% |
Problem reported from build script (1)
Build ecash-lib-integration-tests failed with exit code 5
Build failure condition (1)
Process exited with code 5 (Step: Command Line)
Loading build log messages...
ALP
(1)
TxBuilder P2PKH ALP. |
SLP Integration Test
(3)
TxBuilder
(1)
9 tests passed (all tests)