Loading...
Guest user 
« #74734
 
All history
 
#74736 »
Result: Build chronik-client-integration-tests failed with exit code 1 Agent: buildagent2  ( ABC Build Pool pool)
Time: 28 Mar 24 13:51 - 14:00 (8m:56s) Triggered by: Phabricator Staging on 28 Mar 24 13:50
Branch:

Code coverage

Methods: 23%23% Blocks: 27.4%27.4% Lines: 27.4%27.4%

Build problems: 2 (2 new)

Problem reported from build script (1)
Build chronik-client-integration-tests failed with exit code 1  
Build failure condition (1)
Process exited with code 1 (Step: Command Line)  
 Loading build log messages...
×

×

Pin build

Cancel
×

Add build comment

Cancel
×

Promote Build

×

Add build comment

Cancel
×

Mute test

×

×

Server communication failure

Server is unavailable

Server stopped or communication with the server is not possible due to network failure.

Server shutdown started.

Please relogin to continue your work.

×

Run Custom Build

×

TODO

Loading related builds...
Cancel
×

Responsibility

×

Edit tags

Cancel
×

Loading...

×

Are you sure?

Cancel
×

Cancel